Welcome to Nuclear Fusion and Plasma Physics, Today is Share:

NUCLEAR FUSION AND PLASMA PHYSICS ›› 2018, Vol. 2 ›› Issue (2): 236-242.DOI: 10.16568/j.0254-6086.201802018

• Nuclear Fusion Engineering and Technology • Previous Articles     Next Articles

Analysis on differences of design rules for Class 1, Class 2 and Class 3 components in RCC-MR 2007

LI Guo-qing1, WANG Wen-hua1, LI Yu-fang1, LI Xiang-bin2,LUO Feng1, WU Feng-feng1, LIU Fu-gui1   

  1. (1. Institute for Standardization of Nuclear Industry, Beijing 100091; 2. China International Nuclear Fusion Energy Program Execution Center, Beijing 100038)
  • Received:2017-05-11 Revised:2018-01-22 Online:2018-06-15 Published:2018-06-15

核装置机械部件设计和建造规则中 1、2和3级设备设计要求差异分析

李国青1,王文华1,李昱昉1,李向宾2,罗 峰1,吴凤凤1,刘富贵1   

  1. (1. 核工业标准化研究所,北京 100091;2. 中国国际核聚变能源计划执行中心,北京 100038)
  • 作者简介:李国青(1981-),男,浙江温州人,硕士,研究员级高级工程师,主要从事核领域标准化研究。

Abstract:

Design and construction rules for mechanical components of nuclear installations (RCC-MR 2007) code are prescribed for design and manufacture of components or parts that form plasma chamber first confinement barrier and some system related components in ITER Project. On the base of contents of RCC-MR 2007, the differences of general requirements, materials, design rules and analysis rules for component behavior among Class 1 components, Class 2 components and Class 3 components are analyzed and compared. The differences of design requirements for shells, piping, box structures, heat exchanger elements, valves, and bellows among three Classes are also analyzed and compared.

Key words: RCC-MR 2007, Components, Design requirements, Analysis, ITER

摘要:

核装置机械部件设计和建造规则(RCC-MR 2007)是ITER装置中构成等离子体腔室第一道密封屏障的设备或部件设计和制造的依据。本文在研究RCC-MR 2007主要内容的基础上,分析了RCC-MR 2007中1、2、3级机械设备设计相关的通用要求、材料要求、设计通则、设备性能分析要求之间的区别,同时对1、2、3级壳体、管道、箱式结构、热交换器、阀门和波纹管设计要求之间的差异进行了分析。

关键词: RCC-MR 2007, 设备, 设计要求, 分析, ITER

CLC Number: