[1] Campell D. ITER research plan[R]. France, 2009.
[2] Mohamed A Abdou. A volumetric neutron source for fusion nuclear technology testing and development[J]. Fusion Eng. Des., 1995, 27(7): 111-153.
[3] Abdou M, Morley N B, Smolentsev S, et al. Blanket/first wall challenges and required R&D on the path to DEMO [J]. Fusion Eng. Des., 2015,100(7): 2-43.
[4] Stambaugh R D, Chan V S, Garofalo A M, et al. Fusion nuclear science facility candidates[J]. Fusion Science and Technology, 2011, 59(2): 279-307.
[5] Francesco Romanelli. A roadmap to the realisation of fusion energy [R]. Zurich, Kjell Johnsen Auditorium (CERN), 2013.
[6] Wong C P C, Chan V S, Garofalo A M, et al. Fusion Nuclear science facility-AT: a material and component testing device[J]. Fusion Science & Technology, 2012, 62(1): 283-288.
[7] Garofalo A M, Abdou M A, Canik J M, et al. A fusion nuclear science facility for a fast-track path to DEMO[J]. Fusion Eng. Des., 2014, 89(7?8): 876-881.
[8] Wan Y, Li J, Liu Y, et al. Overview of the present progress and activities on the CFETR[J]. Nucl. Fusion, 2017, 57(10): 102009.
[9] Wan B, Ding S, Qian J, et al. Physics design of CFETR: Determination of the device engineering parameters[J]. IEEE Transcations on Plasma Science, 2014, 42(3): 495-502.
[10] Freidberg J P, Mangiarotti F J, Minervini J. Designing a tokamak fusion reactor--How does plasma physics fit in[J]. Phys. Plasmas, 2015, 22(7): 3-1532.
|