[1] ITER research plan[Z]. ITER_Research_Plan_2FB8AC V2.2, November 12, 2009.
[2] 冯开明. ITER实验包层计划综述[J]. 核聚变与等离子体物理, 2006, 26(3): 162.
[3] Boccaccini L V, Fischer U, Kleefeldt K, et al. Strategy for the blanket testing in ITER[J]. Fusion Engineering and Design, 2002, 61-62: 423-429.
[4] 高椿明, 陈志, 冯开明, 等. 中国ITER实验包层模块电磁安全分析初步[J]. 核聚变与等离子物理, 2006, 26(3): 203.
[5] Feng K M, Zhang G S, Wang X Y, et al. Design description document for the Chinese helium-cooled solid breeder TBMs[R]. Chengdu: Southwestern Institute of Physics, 2004.
[6] Feng K M, Pan C H, Zhang G S, et al. Preliminary design for a China ITER test blanket module[J]. Fusion Engineering and Design, 2006, 81: 1219-1224.
[7] Pan C H. Progress/update for TBM-related activities and planning/schedule of CN TBM program[R]. 4rd Meeting of the ITER Council TBM Program Committee, October 22-23, 2010, Chateau de Cadarache, France.
[8] Load specification (LS) – annex of project integration document (PID) ITER_D_222QGL V 3.0[Z]. July 2005.
[9] Bachmann C. Load specification for the ITER vacuum vssel[R]. ITER_D_2F52JY, V.2.4[Z]. January 4, 2011.
[10] ANSYS documentation[Z]. ANSYS Co. Ltd., 2008.
[11] Roccella R, Boccaccini L V, Meyder R, et al. Assessment of EM loads on the EU HCPB TBM during plasma disruption and normal operating scenario
including the ferromagnetic effect[J]. Fusion Engineering and Design, 2008, 83: 1212-1216.
[12] Wang Pinghuan, Chen Jiming, Liu Shi, et al. Preliminary results on the research of CLF-1 steel[R]. Presented at 9th China-Japan Symposium on material of advanced energy and fusion-fission engineering, Oct. 23-26, 2007. |