核工业西南物理研究院 ›› 2024, Vol. 44 ›› Issue (3): 290-296.DOI: 10.16568/j.0254-6086.202403007

• 核聚变工程 • 上一篇    下一篇

EAST 准直测量基准控制网升级改造方案的设计及实施

顾永奇 1, 2,郑元阳 1 ,袁 忠 1 ,王 俊 1 ,魏文琪 1    

  1. (1. 中国科学院等离子体物理研究所,合肥 230031; 2. 中国科学技术大学,合肥 230026) 
  • 收稿日期:2022-12-06 修回日期:2023-12-27 出版日期:2024-09-15 发布日期:2024-09-13
  • 作者简介:顾永奇(1986-),男,河南周口人,在读工程博士研究生,高级工程师,主要从事精准直测量定位技术研究。
  • 基金资助:
    国家自然科学基金(12105185);中国科学院项目(O75ETY9);合肥国家综合科学中心 EAST 性能提升项目

Design and application of alignment and metrology datum control network upgrade scheme on EAST 

GU Yong-qi1, 2, ZHENG Yuan-yang1 , YUAN Zhong1 , WANG Jun1 , WEI Wen-qi1    

  1. (1. Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031; 2. University of Science and Technology of China, Hefei 230022)
  • Received:2022-12-06 Revised:2023-12-27 Online:2024-09-15 Published:2024-09-13

摘要: 为了获得更高等离子体运行参数和更长的运行时间,对 EAST 装置进行了升级改造。介绍了在 EAST性能升级改造过程中,准直测量基准控制网改造升级方案。增加了基准点的数量,优化了基准点的布局,采用水准仪和多台站激光跟踪仪对内外基准控制网进行多路径测量,并利用 SA 软件进行统一空间测量网络(USMN)的三维平差分析计算。通过测量数据分析,获得准直测量基准控制网的实测平均测量不确定度为 0.039mm,最大测量不确定度为 0.176mm,优于设计要求平均测量不确定 0.15mm和最大测量不确定度 0.20mm,满足了 EAST升级改造后新型偏滤器及关键部件的安装需求。

关键词: EAST, 准直测量, 基准控制网, USMN, 测量不确定度

Abstract: To obtain higher plasma operating parameters and longer running time, the EAST has been upgraded. The upgrade scheme of alignment and metrology datum control network on EAST is introduced. The number of fiducial points is increased, and the layout of the fiducial points is optimized. Horizontal level and multi-station laser tracker are used for multi-path measurement of the internal and external datum control network, and SA software is used to carry out 3D deviation analysis and calculation of the unified space metrology network (USMN). Through measurement data analysis, the average measurement uncertainty of all fiducial points is 0.039mm and the maximum measurement uncertainty is 0.176mm, which are better than the design requirements of average measurement uncertainty of 0.15mm and maximum measurement uncertainty of 0.20mm, meeting the installation requirements of new divertors and key components in EAST upgrading. 

Key words: EAST, Alignment and Metrology, Datum control network, USMN, Measurement uncertainty 