[1] Shimada M, Campbell D J, Mukhovatov V. Progress in the ITER physics basis: chapter 1 overview and summary[J]. Nucl. Fusion, 2007, 47: S1-S17.
[2] Aymar R, Barabaschi P, Shimomura Y. The ITER design[J]. Plasma Phys. Contr. Fusion, 2002, 44(5): 519-565.
[3] Waganer L M. ARIES cost account documentation[D].San Diego: University of California, 2013.
[4] Reid R L. ITER systems code[R]. R88ORNL-FEDC-87-7.
[5] Wong C P C, Wesley J C, Stambaugh R D, et al. Toroidal reactor designs as a function of aspect ratio and elongation[J]. Nucl. Fusion, 2002, 42(5): 547-556.
[6] Wan Yuanxi, Li Jiangang, Liu Yong, et al. Overview of the present progress and activities on the CFETR [J].Nucl. Fusion, 2017, 57(10): 102009.
[7] 袁保山, 姜韶风, 陆志鸿. 托卡马克工程装置基础[M]. 北京: 原子能出版社, 2011.
[8] Thomson S L Sys (Systems) coded cost accounting[R].ORNL memo FEDC-M-SE-004, Feb 19, 1988.
[9] International Atomic Energy Agency. ITER-FEAT outline design report [R]. ITER Meeting, Tokyo, January 2000.
[10] International Atomic Energy Agency. Summary of ITER final design report [R]. ITER EDA Documentation Series No.22, VIENNA: IAEA, July 2001.
[11] Ciazynski D. Review of Nb3Sn conductors for ITER [J],Fusion Engineering and Design, 2007, 82(5-14): 488-497.
[12] Stambaug R D, Chan V S, Garofalo A M, et al. Fusion nuclear science facility candidates[J]. Fusion Science and Technology, 2011, 59(2): 279-307. |