[1] Pan C, the HCCB-TBM Team from CN. HCCB-TBS preliminary safety report (V2.1)[R]. ITER_D_ 4GQFEB,2014.
[2] 赵周, 胡刚, 王琦杰, 等. 中国氦冷固态增殖剂实验包层模块1×4 方案子模块后板结构设计[J]. 核聚变与等离子体物理, 2014, 34(3): 224−229.
[3] 冯开明, 张国书, 栗再新, 等. 中国氦冷固态增殖剂实验包层模块设计描述报告(第三版)[R]. 成都: 核工业西南物理研究院, 2013.
[4] FENG Yongjin, FENG Kaiming, CAO Qixiang, et al.Current status of the fabrication of Li4SiO4 and beryllium pebbles for CN HCCB TBM in SWIP[J]. Plasma Science and Tchnology, 2013,15: 291.
[5] Iseli M. Safty guidelines for test blanket systems (V3.1)[R]. ITER_D_338HVX, 2011.
[6] Wu Xinghua. Engineering analysis of the HCCB TBM-set (V1.0)[R]. ITER_D_PNW7FJ, 2014.
[7] Pan C. HCCB-TBS CD neutronics analysis report(V1.2)[R]. ITER_D_N7T8EG, 2014.
[8] Iseli M. Accident analysis specifications for TBM (V1.2)[R]. ITER_D_2UV6AZ, 2010.
[9] Topilski L. Accident analysis report (AAR) volume II,v4.10[R]. ITER_D_2DJFX3, 2010. |