|
[1] WU S, EAST Machine Team. EAST machine assembly
and its measurement system [J]. Fusion Engineering and
Design, 2005, 73: 135−140.
[2] WU S, EAST Team. An overview of the EAST project [J].
Fusion Engineering and Design, 2007, 82: 463−471.
[3] 毕延芳, 马登奎. 高温超导电流引线在 EAST 装置工
程调试中投运 [J]. 低温物理学报 , 2007, 29(2):
131−135.
[4] 毕延芳. EAST 超导托卡马克磁体的大型供电供冷外馈
线 [J]. 低温物理学报, 2009, 31(4): 333−337.
[5] DING K, BI Y, FENG H, et al. Development of ITER
HTS current lead at ASIPP [J]. Physics Procedia, 2012,
36: 931−936.
[6] 《机械工程材料性能数据手册》编委会. 机械工程材
料性能数据手册 [M]. 北京: 机械工业出版社, 1995.
415−418.
|