欢迎访问《核聚变与等离子体物理》官方网站,今天是 分享到:

核工业西南物理研究院 ›› 2024, Vol. 44 ›› Issue (4): 401-408.DOI: 10.16568/j.0254-6086.202404005

• 核聚变工程 • 上一篇    下一篇

HL-3 装置环向场线圈热工分析

王佳琪,蒙建鹏,贾瑞宝,刘晓龙,李 强,陈 鑫,颉延风*   

  1. (核工业西南物理研究院,成都 610041)
  • 收稿日期:2022-10-13 修回日期:2024-08-16 出版日期:2024-12-15 发布日期:2024-12-10
  • 作者简介:王佳琪(1997-),男,陕西渭南人,硕士研究生,从事聚变装置水冷系统研究。
  • 基金资助:
    西物创新(202102XWCXRZ001)

Thermal analysis of toroidal field coils on HL-3 tokamak

WANG Jia-qi, MENG Jian-peng, JIA Rui-bao, LIU Xiao-long,LI Qiang, CHEN Xin, XIE Yan-feng   

  1. (Southwestern Institute of Physics, Chengdu 610041)
  • Received:2022-10-13 Revised:2024-08-16 Online:2024-12-15 Published:2024-12-10

摘要: 利用 COMSOL Multiphysics 软件对 HL-3 装置环向场线圈(TF)进行了热工水力分析,研究了不同工况下线圈的冷却效率,得到了冷却水的压力、流量及温度分布情况。分析结果表明,TF 线圈的冷却时间控制在 900s 内完全可以满足装置的冷却需求。在 140kA 和 190kA 电流的条件下,一次通电周期内线圈的最高温度不会超过 80℃,不会对线圈之间的匝间绝缘造成破坏。TF 线圈的主要发热集中在中心柱段,在对线圈施加冷却措施下,600s 时线圈的温度可以降到较低的范围,900s 时可以使线圈得到充分的冷却。线圈内部管道中的冷却水流速控制在 2~4m·s−1 较为合适,入口压力不宜超过 0.45MPa。在必要的情况下,可以将 TF 线圈的冷却时间减少至 600s。

关键词: HL-3 装置, 环向场线圈, 热工分析

Abstract: The thermal analysis on the toroidal field coil of HL-3 tokamak is carried out by using COMSOL Multiphysics software. The cooling efficiency of the coil under different working conditions is studied, and the pressure, flow rate and temperature distribution of cooling water are obtained. The results show that the cooling time of toroidal field (TF) coil controlled within 900s can fully meet the requirements of the device. Under the condition of 140kA and 190kA flat top current, the maximum temperature of the coil in one discharge will not exceed 80℃, which will not damage the inter turn insulation between the coils. The main heat generation of TF coil is concentrated in the central post section. When cooling is applied to the coil, the temperature of the coil after 600s can be reduced to a lower range, and the coil can be fully cooled after 900s. The flow rate of cooling water in the internal pipe of the coil should be controlled at 2~4m·s−1, and the inlet pressure cannot exceed 0.45MPa. The cooling time of TF coil can be reduced to 600s.

Key words: HL-3 tokamak, Toroidal field coil, Thermal analysis;

中图分类号: